Search the archive

14,369 indexed articles, 13,297 of them summarised by us.

Articles
14,369
Research papers
91,965
Models priced
2,253
Providers
163

6 results for “kw_only”

Newest and most relevant first

NVIDIA Vera Rubin NVL72 Leads Agentic Inference Performance on MLPerf Endpoints v1.0

NVIDIA's provisional MLPerf results suggest Vera Rubin NVL72 delivers 5-10x better agentic inference efficiency than GB300, which will shape hardware procurement and serving costs once verified.

NVIDIA published provisional MLPerf Endpoints benchmark results for its Vera Rubin NVL72 AI system, comparing it against its previous GB300 NVL72 platform. On agentic workloads, where AI assistants handle multi-turn tasks, the new system delivers 5 to 10 times more output per unit of electricity while keeping responses equally fast. The results cover three open models (Kimi K3, DeepSeek-V4.1-Flash, Qwen3.6-35B-A3B) and must still pass MLCommons peer review.

Vera Rubin NVL72 posts over 10x the throughput per kilowatt of GB300 NVL72 on Kimi K3 at matched responsiveness (50 tokens per second per user), and 5-10x better efficiency across Kimi K3, DeepSeek-V4.1-Flash and Qwen3.6-35B-A3B. For operators running AI agents, this means more concurrent users within the same power budget. Caveats: results are provisional pending MLCommons verification, GB300 figures are verified, and the comparison was self-submitted by NVIDIA.

Provisional MLPerf Endpoints v1.0 results: Vera Rubin NVL72 achieves 41,414 tokens/sec at 100.89 kW on Kimi K3 (1,024 concurrent, 50.4 tokens/sec/user interactivity) versus GB300 NVL72's 13,906 tokens/sec at 60 kW at matched concurrency. Rubin GPUs pair HBM4, Tensor Cores and sixth-gen NVLink with Dynamo routing, prefix caching, disaggregated serving, DeepSeek MegaMoE kernels and Qwen multi-token prediction with Tensor Core verification. Quality is checked via SWE-bench Verified; results are unverified.

NVIDIA Developer Blog →

How NVIDIA DSX MaxLPS Maximizes AI Factory Throughput and Efficiency

Data center operators running power-constrained AI fleets can deploy ~40% more GPUs on the same power budget, at the cost of a 17% worse P99 time-to-first-token.

Data centers usually reserve enough electricity for every computer chip to run at maximum power at once, but chips rarely all peak together, so power sits unused. NVIDIA's DSX MaxLPS software watches actual power use and lets different machines borrow each other's unused allocation within one shared budget. In a test in Iceland, this let Nscale run 192 AI chips instead of 140 on the same power supply, producing 49% more work. The trade-off: the slowest 1% of requests waited 17% longer for their first response.

For operators building AI data centers against fixed power limits, NVIDIA and Nscale showed DSX MaxLPS turned headroom into capacity: 192 versus 140 GPUs under the same 264.4 kW budget, raising throughput 49.2% and efficiency from 4.10 to 6.12 tokens/s/W at Nscale's Iceland site running Kimi K2.5 inference. Existing instance performance held steady, but P99 time to first token rose 17%. NVIDIA provides a five-stage validation process; sites must still physically provision cooling and power for the larger fleet.

DSX MaxLPS uses policy-governed dynamic power allocation via Dynamic Power Software: telemetry from GPU/node/rack/group levels feeds an allocation loop that raises GPU power limits on under-consuming nodes so others can draw more, within an operator-defined aggregate budget. The Nscale evaluation on GB300 NVL72 (Kimi K2.5 FP4, Dynamo, TensorRT LLM, 8K/1K sequences) compared 140 vs 192 GPUs: aggregate throughput +49.2%, per-instance throughput unchanged, median/P75 latency within 5%, P99 TTFT +17% over a 15.7s baseline. Headroom depends on complementary workload power profiles; the results are GB300-specific and don't project to Vera Rubin.

NVIDIA Developer Blog →

Maximizing AI Factory Performance per Watt with NVIDIA DSX MaxLPS

Data center operators with fixed power budgets can fit up to 40% more Vera Rubin GPU capacity by replacing static rack power provisioning with NVIDIA's dynamic allocation software.

NVIDIA has a set of technologies called DSX MaxLPS that helps large AI computing facilities get more work out of a fixed amount of electricity. Normally, data centers reserve maximum power for every rack even when most racks use less, wasting what NVIDIA calls stranded headroom. Software continuously shifts that unused power between racks as needed. NVIDIA claims this lets a 100 megawatt facility run about 40% more of its next-generation Rubin chips.

For anyone planning an AI data center, power, not chip supply, is the binding constraint, and only about 60% of grid power reaches compute. NVIDIA projects MaxLPS plus power planning can raise Rubin GPU capacity up to 40% in a 100 MW facility, cutting provisioned rack power from 125 kW to 90 kW on GB200 NVL72. Gains depend on inference-heavy workloads and 45°C liquid-cooling infrastructure; facilities sized for training-heavy loads deploy fewer racks on day one.

DSX MaxLPS combines Dynamic Power Software (Developer Preview), which runs a control loop over GPU/rack/group telemetry to reallocate unreserved headroom within policy-defined groups, with Workload Profile Power Solutions and the Application Performance and Power Manager for inference, training and memory-bound tuning. Vera Rubin NVL72 racks run a 45°C liquid-cooling inlet, enabling free cooling and lower PUE. Measured: GB200 NVL72 provisioned rack power 125→90 kW (39% more racks, ~1.5x perf/watt); Vera Rubin NVL72 136→101 kW (35% more racks, 1.3–1.4x). DSX Exchange, an open-source IT/OT event bus, is optional.

NVIDIA Developer Blog →

Tip: Use keyword-only arguments in Python dataclasses

Python developers can add fields to dataclasses and subclasses without breaking existing constructor calls, reducing refactoring risk in shared code.

Simon Willison shares a tip from developer Christian Hammond on a Python feature called dataclasses, which are shortcuts for creating classes that hold data. By adding a setting called kw_only=True, the class only accepts arguments written by name, not by position. This means new fields can be added later, including in subclasses, without breaking existing code. The tip applies to anyone writing Python.

A short link post from Simon Willison's blog passes along a tip by Christian Hammond: Python teams should define dataclasses with @dataclass(kw_only=True). This forces all constructor arguments to be passed by keyword, so adding new properties later, including in subclasses, no longer risks silently breaking code that passed arguments by position. It is a free, zero-cost coding practice, not a product announcement; no adoption data, benchmarks, or tooling is provided.

Willison links a tip from Christian Hammond: creating a Python dataclass with @dataclass(kw_only=True) makes its constructor accept only keyword arguments. This prevents positional-argument coupling, so new fields can be added to the dataclass or subclasses without breaking existing call sites. The post is a brief link share dated 29th June 2025 with no code examples, version requirements, or caveats discussed.

Simon Willison’s Weblog →

NVIDIA 800 V HVDC Architecture Will Power the Next Generation of AI Factories

Data center power designers must plan for 800 VDC distribution and 1 MW racks by 2027, since current 54 V systems can't supply NVIDIA's next rack scale.

NVIDIA is redesigning how data centers deliver electricity. Today's AI server racks run on 54 volt power, but racks coming in 2027 will need a million watts, too much for that system. The new approach, 800 volts of direct current, sends power in one conversion step, cutting energy waste and copper use. It affects anyone building or operating large AI data centers.

NVIDIA is mandating an 800 VDC power architecture for data centers supporting 1 MW racks starting with Kyber systems in 2027, working with Eaton, Schneider Electric, Vertiv and major chip suppliers. Operators gain up to 5% power efficiency, 70% lower maintenance costs and up to 30% total cost of ownership reduction. Current 54 V racks hit physical limits above 200 kW, so facilities planning AI expansion must budget for this transition.

The architecture converts 13.8 kV AC grid power directly to 800 VDC at the data center perimeter, eliminating intermediate AC/DC conversions and rack-level PSUs; compute racks take 800 V feeds and use DC/DC conversion down to 12 V for GPUs. 800 V busways carry 85% more power per conductor and cut copper by 45% versus 415 VAC, with 1 MW racks otherwise needing 200 kg of copper busbar. End-to-end efficiency improves up to 5%; fault detection and overcurrent protection in VDC systems remain open problems.

NVIDIA Developer Blog →

Building the Modular Foundation for AI Factories with NVIDIA MGX

NVIDIA's MGX spec lets data center builders deploy Blackwell racks in under 90 days instead of 12 months, with 50% lower TCO claimed.

NVIDIA has described MGX, a modular reference design for building the data centers that run large AI systems. Instead of custom-building each server rack, partners snap together standard components, compute trays, power shelves, and liquid-cooling parts, which cuts deployment time from 12 months to under 90 days. Racks using NVIDIA Blackwell chips can draw up to 120 kW. The approach mainly affects hardware makers and cloud providers, not end users.

NVIDIA's MGX architecture lets system builders cut R&D costs by $2–4 million per platform and certify once for the full NVIDIA software stack, while data center operators can scale from 8-GPU nodes to 144-GPU racks and claim up to 50% lower total cost of ownership. Over 200 ecosystem partners have adopted it. The risk for operators is deepening dependence on NVIDIA's certified component ecosystem, though diverse sourcing is said to reduce vendor lock-in.

MGX is a rack-scale reference architecture using compute trays and NVLink switch trays plus standardized electrical, mechanical and liquid-cooling components (54v/1400A busbars, coldplates, quick disconnects). Factory pre-integration covers ~80% of components. Cooling specs allow a coolant differential under 15°C at 1400A loads, supporting 120 kW per rack for GB200/GB300 NVL72. Claims include 94% power supply efficiency and 25x better energy efficiency versus H100 clusters.

NVIDIA Developer Blog →